COSTCOHAYDOCKLANCASHIRE
Client/Main Contractor: Tilbury Douglas
Package Details:
Reinforced concrete substructures, including construction of dock levellers, reinforced concrete retaining walls and reinforced concrete superstructure walls; drainage, including diversion of existing 600mm diameter sewer; external works.
Package Value: £650,000
Package Programme: 6 months
Completed: March 2000
© Killoran Civil Engineering Ltd 2000 Design © Nick Power 2000